Drycleaning using PCE was performed at this facility for less than 19 months (1986-87). The facility is located in a small strip shopping center situtated in a mixed commercial/residential setting. A drainage canal is located approximately 75 feet southwest of the facility. The nearest public water supply well is located approximately 2000 feet southeast of the site. The contaminant source area is the soils beneath the facility floor slab in the vicinity of the drycleaning machine. |
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
cis-1,2-Dichloroethene | groundwater | 63.7 ppb | |
Tetrachloroethene (PCE) | groundwater | 19.9 ppb | |
Tetrachloroethene (PCE) | soil | 190 ppb | |
Trichloroethene (TCE) | groundwater | 27.4 ppb | |
trans-1,2-Dichloroethene | groundwater | 2.6 ppb |
Deepest Significant Groundwater Contamination: | 12ft bgs | |
Plume Size: | Plume Length: 70ft Plume Width: 120ft |
|
Average Depth to Groundwater: | 5ft |
silty, fine to medium-grained sand with shell fragments Depth: 0-24ft bgs 24ft thick Conductivity: 86.4ft/day Gradient: 0.0022ft/ft |
![]() ![]() ![]() ![]() |
Cleanup
Goals: |
Groundwater (MCLs): PCE = 3 µg/l, TCE = 3 µg/l, cis 1,2-DCE = 70 µg/l, trans 1,2-DCE = 100 µg/l Soil cleanup target leachability level: PCE = 30 µg/kg |
In Situ Monitored Natural Attenuation |
Why the technology was selected: Date implemented: Cost to Design and Implement: |
|
In Situ Soil Vapor Extraction |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Cost to Design and Implement: |
|
Ex Situ Carbon Adsorption |
Date implemented: Final remediation design: Results to date: Cost to Design and Implement: |
Cost
for Assessment: |
$70,831 | |
Cost
for Operation and Maintenance: |
$29,910 Groundwater monitoring: $ 4,574 Closure & site restoration: $4,893 | |
Total
Costs for Cleanup: |
$244,806 |
1. Even though drycleaning was performed for less than 19 months at this site and site assessment occurred 13 years after drycleaning operations ceased, drycleaning solvent contamination in soil and groundwater still exceeded cleanup target levels. 2. It is likely that excavation related to installation of the SVE system piping aided in remediation of PCE in soils at the site. |
John Sykes, Project Manager Bureau of Waste Cleanup (MS4520) Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400 (850) 245-8960 john.sykes@dep.state.fl.us Jay McGovern, P.G., Contractor Foster Wheeler Environmental Corp. 759 South Federal Highway, Suite 100 Stuart, Florida 34994-2936 (561) 781-3409 jmcgovern@fwenc.com |
1. Site Assessment Report 9/2000 2. Remedial Action Plan 3/2001 3. Remedial Action Report 12/2001 4. Groundwater Monitoring Reports 2001/2002 |